    An FCM-Based Dynamic Modelling of Integrated Project Delivery Implementation Challenges in Construction Projects

    Get PDF
    Question: What are the Integrated Project Delivery Implementation challenges in construction projects, their interrelationships and their effects on the project time, cost and quality?Purpose: The Purpose of this study is applying an efficient method to determine the most important challenges to IPD implementation in construction industry, and also to evaluate the interrelationships among these challenges and their effects on the project time, cost, and quality.Research Method: This study models available Integrated Project Delivery challengesusing a real case data, through applying Fuzzy Cognitive Mapping technique.Findings: Results show that contractual factors have the major influence compared with others. This shows the significance of paying attention to why project stakeholders must be integrated throughout the project life cycle since early contract documentation stage.Limitations/Implications: This study is limited to the caseselectedfrom Tehran of Iran.Value for authors: This study is significantdue to identifying, classifying and determining the intensity of effects of IPD implementation challenges on cost, time, and quality of construction projects. It results in planning, resolving the challenges, enhancing the quality of constructions and lastly saving the construction cost and time

    Integrated Project Delivery Implementation Challenges in the Construction Industry

    Get PDF
    Huge financial resources are spent in the construction industry all over the world, which are frequently wasted largely due to a lack of proper planning. In recent decades, in an attempt to overcome challenges, various contractual and administrative systems have been used by construction owners/clients. One such system has been Integrated Project Delivery (IPD). Its implementation has, however, experienced drawbacks. Identifying such drawbacks is an initial step in attempting to resolve them, and this paper aims to identify and prioritize the IPD implementation drawbacks in the context of the Iranian construction industry. A comprehensive list of IPD implementation drawbacks is prepared using a questionnaire survey. An in-depth literature review of the IPD concept has been combined with a review of various case studies applying the IPD system. The results were analyzed using the Robust Exploratory Factor Analysis (EFA) method. 22 drawbacks in the Construction Industry were categorized under four themes; contractual, environmental, managerial, and technical. Results show that contractual drawbacks are the most significant. The implication of this research is that identifying and classifying IPD implementation drawbacks provides a useful reference to managers and owners of the construction industry, for identifying and codifying solutions to overcome them.Huge financial resources are spent in the construction industry all over the world, which are frequently wasted largely due to a lack of proper planning. In recent decades, in an attempt to overcome challenges, various contractual and administrative systems have been used by construction owners/clients. One such system has been Integrated Project Delivery (IPD). Its implementation has, however, experienced drawbacks. Identifying such drawbacks is an initial step in attempting to resolve them, and this paper aims to identify and prioritize the IPD implementation drawbacks in the context of the Iranian construction industry. A comprehensive list of IPD implementation drawbacks is prepared using a questionnaire survey. An in-depth literature review of the IPD concept has been combined with a review of various case studies applying the IPD system. The results were analyzed using the Robust Exploratory Factor Analysis (EFA) method. 22 drawbacks in the Construction Industry were categorized under four themes; contractual, environmental, managerial, and technical. Results show that contractual drawbacks are the most significant. The implication of this research is that identifying and classifying IPD implementation drawbacks provides a useful reference to managers and owners of the construction industry, for identifying and codifying solutions to overcome them

    Adopting an integrated project delivery collaboration framework: a case study of a wastewater treatment plant project in Vietnam

    No full text
    Integrated project delivery (IPD) is introduced as a new delivery system that aims to transform and enhance the current delivery systems. For such an accomplishment, the IPD integrates people, systems, and business into an integrated platform delivering accurate information and new technologies in a collaborative team environment. In this sense, the current research reviews the IPD principles, benefits, and challenges, and creates a proposed framework that applies a percentage ratio with mathematical weight calculation to classify and identify the IPD collaboration level present in a construction project. For the data validation, a case study is performed, where the information of the WWWTP project is inserted into the proposed framework. The results illustrate that the case study scores a total sum of 30% of IPD collaboration present in the project, where it is classified as having a low IPD collaboration level. The significance of this study is that it helps project stakeholders in the construction industry to understand the important factors that lead to IPD adoption and develop the principles of IPD. The current study creates an updated and simple approach framework aiming to support the professional area as well as allowing a solid basis for future research.</p